Pre-construction services
for all stages of RIBA
Contact us today to download our
RIBA poster to see how we can help you.
Stages of RIBA: Plan of works
An early-stage joint operation approach.
Surveys, utilities, and reports, before any construction happens a project will have many different stages to complete. Evolution offers an all in one service that helps manage and collate all the different services and requirements under one contract, a total pre-construction service package.
Unlike having the principal contractor do all these early-stage set-up services, having a turn-key service specifically for these stages means any cost-benefit goes back to you (the client).
V1
Stage 0: Strategic definition.
• Business case is developed.
• Review of project risks.
• Options to optimise client requirements.
• Undertake site appraisals.
Stage 1: Prep and Briefing
• Project outcomes
• Sustainability outcomes
• Quality aspirations
• Feasibility studies
• Project budget
• Site information (surveys)
• Project programme
• Project execution plan
Stage 2: Concept design
• Prepare architectural concept.
• Strategic engineering.
• Cost plan.
• Project strategies.
• Outline of specification.
• Project Brief Derogations.
• Design reviews with clients and stakeholders.
• Design the programme.
Stage 3: Spacial coordination
• Design studies.
• Engineering analysis.
• Costs exercises.
• Cost plan.
• Project strategies.
• Outline specification.
• Design programme.
Stage 4: Technical design
• Develop technical designs
• Prepare building systems information
• Integrate specialist sub-contractor building systems
information
• Prepare stage design programme
Stage 5: Manufacturing & construction
• Finalise site logistics
• Manufacturing building systems
• Monitor programme
• Quality inspections
• Resolving site queries preparing building material